CDF PROJECTS IMPLEMENTED BY WARD

Kawimbe Ward

Water Borne Ablution Block and Mechanised Water Reticulation System Constructed at Kawimbe Day Secondary School under the 2024 CDF alloation. 

1×3 Classroom Block Constructed at Kawimbe Day Secondary School under the 2022 CDF allocation, furnished with 60 Desks procured under the 2023/4 CDF allocation.

Nzunzu Ward

Mechanised Water Reticulation System constructed at Uningi Rural Health Post to supply water to the CDF constructed Ablution Block.

Waterborne Ablution Block Constructed at Uningi Rural Health Post under the 2023 CDF allocation.